{"id":1291,"date":"2018-10-04T18:43:16","date_gmt":"2018-10-04T18:43:16","guid":{"rendered":"https:\/\/atisa.com\/blog\/?p=1291"},"modified":"2019-10-16T20:02:07","modified_gmt":"2019-10-16T20:02:07","slug":"ribbon-cutting-for-coral-a-smaller-industrial-building","status":"publish","type":"post","link":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/","title":{"rendered":"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious schedule, and this building is the 2<\/span><span style=\"font-weight: 400;\">nd<\/span><span style=\"font-weight: 400;\"> of five industrial buildings scheduled to be ready by the end of the year. A notable feature of this new building is that it is the <\/span><i><span style=\"font-weight: 400;\">only<\/span><\/i><span style=\"font-weight: 400;\"> Class A building of its size in all of Tijuana. \u00a0Even with a size of 28,690 sq ft, the building features 28\u2019 clearance height with 100% natural lighting via skylights. \u00a0The building is located on an impressive land area of 51,545 square feet. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Director of Sales and Marketing, Rick Chatham, opened the ceremony by welcoming our guests and pointing out some details about the building. The building includes 26,387 square feet of production space and 2,173 square feet of office space. There are 3 docks and 22 parking spaces. As is true with Atisa buildings, modifications can tailor the building to just about any operation. The entrance contains a security booth.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Rick gave an update on the just-completed trade negotiations and agreement including the U.S., Mexico, and Canada (USMCA). This agreement is set to replace NAFTA, which was originally signed 25 years ago.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Real Estate Director, Rafael Martinez spoke briefly about the future of Parque Industrial Pacifico, Atisa\u2019s manufacturing park. Our company continues to pursue aggressive growth plans, with at least 3 more buildings opening this year. \u00a0A new road improvement program has also begun, which will upgrade all roads with the park.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Finally, CEO Christian Carrillo spoke about upcoming opportunities for the company. \u00a0He highlighted Atisa&#8217;s participation in the SIOR Fall Conference (Denver) next week. The booth will feature an assortment of high visibility products (Plantronics headsets, Fender Guitar, Toyota Tacoma) that are all made right here in Tijuana. \u00a0All those products will be given away at the end of the show, creating one of the biggest giveaways that the conference has ever seen.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Guests were guided outside for the traditional ribbon cutting and group photo.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The event ended with a giveaway including wine from the Guadalupe Valley and an iPad.<\/span><\/p>\n<p>For more information about our industrial park and\/or available buildings, please contact us at info@atisa.com or call us at US 1 (855) 512 4368 or MX 01 (800) 262 2278.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious schedule, and this building is the 2nd of five industrial buildings scheduled to be ready by the&hellip; <a href=\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\" class=\"more-link\">Continue Reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":14,"featured_media":1293,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1,185],"tags":[222,224,218,216,220,226,26],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building - Atisa Industrial<\/title>\n<meta name=\"description\" content=\"On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building - Atisa Industrial\" \/>\n<meta property=\"og:description\" content=\"On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious\" \/>\n<meta property=\"og:url\" content=\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\" \/>\n<meta property=\"og:site_name\" content=\"Atisa Industrial\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-04T18:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-10-16T20:02:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"931\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ATISA Industrial\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ATISA Industrial\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\"},\"author\":{\"name\":\"ATISA Industrial\",\"@id\":\"https:\/\/atisa.com\/blog\/#\/schema\/person\/e91456d6660b5929a4f1720891859e1b\"},\"headline\":\"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building\",\"datePublished\":\"2018-10-04T18:43:16+00:00\",\"dateModified\":\"2019-10-16T20:02:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\"},\"wordCount\":373,\"publisher\":{\"@id\":\"https:\/\/atisa.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg\",\"keywords\":[\"#availablebuildings\",\"#brokers\",\"#industrial\",\"#industrialbrokers\",\"#industrialbuildings\",\"#sandiego\",\"Tijuana\"],\"articleSection\":[\"Buildings for lease Tijuana\",\"EN\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\",\"url\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\",\"name\":\"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building - Atisa Industrial\",\"isPartOf\":{\"@id\":\"https:\/\/atisa.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg\",\"datePublished\":\"2018-10-04T18:43:16+00:00\",\"dateModified\":\"2019-10-16T20:02:07+00:00\",\"description\":\"On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious\",\"breadcrumb\":{\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage\",\"url\":\"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg\",\"contentUrl\":\"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg\",\"width\":1400,\"height\":931},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/atisa.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/atisa.com\/blog\/#website\",\"url\":\"https:\/\/atisa.com\/blog\/\",\"name\":\"Atisa Industrial\",\"description\":\"Leaders in industrial buildings and quality real estate.\",\"publisher\":{\"@id\":\"https:\/\/atisa.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/atisa.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/atisa.com\/blog\/#organization\",\"name\":\"Atisa Group\",\"url\":\"https:\/\/atisa.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/atisa.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2015\/12\/Atisa-logo.png\",\"contentUrl\":\"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2015\/12\/Atisa-logo.png\",\"width\":178,\"height\":46,\"caption\":\"Atisa Group\"},\"image\":{\"@id\":\"https:\/\/atisa.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/atisa.com\/blog\/#\/schema\/person\/e91456d6660b5929a4f1720891859e1b\",\"name\":\"ATISA Industrial\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/atisa.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/40877e1eb50522b23ed45f495f835cc3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/40877e1eb50522b23ed45f495f835cc3?s=96&d=mm&r=g\",\"caption\":\"ATISA Industrial\"},\"url\":\"https:\/\/atisa.com\/blog\/author\/lizeth\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building - Atisa Industrial","description":"On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/","og_locale":"en_US","og_type":"article","og_title":"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building - Atisa Industrial","og_description":"On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious","og_url":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/","og_site_name":"Atisa Industrial","article_published_time":"2018-10-04T18:43:16+00:00","article_modified_time":"2019-10-16T20:02:07+00:00","og_image":[{"width":1400,"height":931,"url":"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg","type":"image\/jpeg"}],"author":"ATISA Industrial","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ATISA Industrial","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#article","isPartOf":{"@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/"},"author":{"name":"ATISA Industrial","@id":"https:\/\/atisa.com\/blog\/#\/schema\/person\/e91456d6660b5929a4f1720891859e1b"},"headline":"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building","datePublished":"2018-10-04T18:43:16+00:00","dateModified":"2019-10-16T20:02:07+00:00","mainEntityOfPage":{"@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/"},"wordCount":373,"publisher":{"@id":"https:\/\/atisa.com\/blog\/#organization"},"image":{"@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage"},"thumbnailUrl":"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg","keywords":["#availablebuildings","#brokers","#industrial","#industrialbrokers","#industrialbuildings","#sandiego","Tijuana"],"articleSection":["Buildings for lease Tijuana","EN"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/","url":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/","name":"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building - Atisa Industrial","isPartOf":{"@id":"https:\/\/atisa.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage"},"image":{"@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage"},"thumbnailUrl":"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg","datePublished":"2018-10-04T18:43:16+00:00","dateModified":"2019-10-16T20:02:07+00:00","description":"On October 2, 2018, Atisa held a brief, 45-minute ribbon-cutting ceremony for the latest of their manufacturing buildings. \u00a0We are on an ambitious","breadcrumb":{"@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#primaryimage","url":"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg","contentUrl":"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2018\/10\/atisa-1.jpg","width":1400,"height":931},{"@type":"BreadcrumbList","@id":"https:\/\/atisa.com\/blog\/ribbon-cutting-for-coral-a-smaller-industrial-building\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/atisa.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Ribbon Cutting for Coral \u2013 A \u201cSmaller\u201d Industrial Building"}]},{"@type":"WebSite","@id":"https:\/\/atisa.com\/blog\/#website","url":"https:\/\/atisa.com\/blog\/","name":"Atisa Industrial","description":"Leaders in industrial buildings and quality real estate.","publisher":{"@id":"https:\/\/atisa.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/atisa.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/atisa.com\/blog\/#organization","name":"Atisa Group","url":"https:\/\/atisa.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/atisa.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2015\/12\/Atisa-logo.png","contentUrl":"https:\/\/atisa.com\/blog\/wp-content\/uploads\/2015\/12\/Atisa-logo.png","width":178,"height":46,"caption":"Atisa Group"},"image":{"@id":"https:\/\/atisa.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/atisa.com\/blog\/#\/schema\/person\/e91456d6660b5929a4f1720891859e1b","name":"ATISA Industrial","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/atisa.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/40877e1eb50522b23ed45f495f835cc3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40877e1eb50522b23ed45f495f835cc3?s=96&d=mm&r=g","caption":"ATISA Industrial"},"url":"https:\/\/atisa.com\/blog\/author\/lizeth\/"}]}},"_links":{"self":[{"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/posts\/1291"}],"collection":[{"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/comments?post=1291"}],"version-history":[{"count":2,"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/posts\/1291\/revisions"}],"predecessor-version":[{"id":1294,"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/posts\/1291\/revisions\/1294"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/media\/1293"}],"wp:attachment":[{"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/media?parent=1291"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/categories?post=1291"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/atisa.com\/blog\/wp-json\/wp\/v2\/tags?post=1291"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}